Vidanta footbridge. Nuevo Vallarta. Mexico. 2023.


Scope CFC
Construction engineering


Project Manager
Lucía Fernández Muñoz


Property
Vidanta Nuevo Vallarta Golf


End of construction year
2025


Type
Cable-stayed Footbridge

This is a cable-stayed footbridge across the river Aneca. The span distribution is: 25.4+35.6+170.0+35.6+25.4.

The deck is 6.6 m wide, with two zones, one 3.45 m wide to accommodate light vehicle and bicycle traffic and the other 1.50 m wide for pedestrians.

The deck of the main span is formed by two longitudinal edge beams, where the braces are housed, joined by a slab and transverse ribs, and the side spans are lightened slabs. The tower has a height of 34.4 m above the deck and is V-shaped.