The execution of the piles begins on the “Barra Vieja” Bridge over the Papagayo River in Mexico.
The execution of the piles has begun on the ‘Barra Vieja’ Bridge over the Papagayo River in the state of Guerrero (Mexico). Of a total of 130 piles of a 1.5 m diameter, more than 40 have been built to date. The “Barra Vieja’ was designed by CFCSL to replace the bridge...