Cadiz Bay Bridge. Reaching the compensation span piers with a 218.5 m cantilever with no back stays.
Juan Antonio Navarro, a senior engineer with CFC, explains how the cantilever deck, without any kind of back stays (218.5 m long on the midspan side and 198.5 m long on the compensation span side), is about to reach the first pier of the compensation span, as we can see in the...