First closure of spans in the Narcea viaduct.
The first closure of the Viaduct over the River Narcea (Previous news) has been successfully carried out between spans, by blocking out the cantilevered decks between piers P5 and P6. A simple design with 4 no. steel profiles was employed. The inferior slab pre-stressing was...