Scope : Conceptual Design and Detailed Design
Coordinator : Javier Manterola Armisén
Project Manager : Miguel Angel Astiz
Property : National Roads Authority
Construction : Dragados S.A 50% y Ascon Limited 50%
End Year Construction : 2009
Typology : Cable-stayed Bridge
Material : Composite
Team : Javier Manterola Armisén, Miguel Ángel Astiz Suárez, Javier Muñoz-Rojas Fernández, Lucía Blanco Martín, Sara Fernández Alonso
GeopositionView ProjectThe cable-stayed bridge over the River Suir in Waterford (Ireland) forms part of a Waterford City bypass. The bridge has a 225 m long main span and a single tower. The side compensation spans are 45, 70 y 90 m long respectively.