By :
Comments : Off

Antonio Martínez Cutillas, engineer of CFCSL, awarded with the Medal of Professional Merit of the Civil Engineers College.

June 13th, the Civil Engineers Colleg, handed out the annual awards of professional recognition to the members who have stood out in a relevant way, carried out professional actions of unquestionable merit or rendered outstanding services to the profession. The event was headed...
By :
Comments : Off
By :
Comments : Off

The Torres Colón 1969-2019 exhibition

A time-travelling journey through one of the works that define Spanish architecture of the last half of the 20th century. The Torres Colón 1969-2019 exhibition, which can be visited between the 11th of April and 16th of July in Fernán Gómez Centro Cultural de la Villa (Madrid),...
By :
Comments : Off

The Torres Colón 1969-2019 exhibition.

A time-travelling journey through one of the works that define Spanish architecture of the last half of the 20th century. The Torres Colón 1969-2019 exhibition, which can be visited between the 11th of April and 16th of July in Fernán Gómez...
By :
Comments : Off

Bridge over Tagus river at Alcántara reservoir. Cáceres.

10 hypothesis of load test More information. Photos & Video: Carlos Manterola Jara.
By :
Comments : Off

The construction of the River Barrow Bridge is advancing quickly.

The construction of the River Barrow Bridge is advancing quickly. Presently 7 out 19 cables have been stressed at the central pylon and 3 out of 9 cables have been stressed at the lateral pylons. The cantilevers are about 64 m long from the central pylon and 41 m long from the...
By :
Comments : Off

The central box of span 9 is being cast. Bridge over Barrow river. New Ross. Ireland.

At the present moment the West approach spans (1 to 3) are finalized and the East approach spans (6 to 9) shall be finalized soon: the central box of span 9 is being cast and the overhangs of spans 6 and 7 have already been built. Main activity concentrates on the pylons and on...
By :
Comments : Off

Concreting the last section of the bridge over the Tagus River in the Alcántara reservoir. Cáceres.

Fifteen days ago, the concreting of the last section of the Viaduct over the Tagus River was carried out, which means the closure of the structure. Corresponds to a section of 27 meters attached to the key pile . After this operation, only the realization of the prestressing of...
By :
Comments : Off

Cebú-Córdova Bridge. 6 months from the beginning of the construction. CFCSL design & construction project.

It has been six months since the beginning of the construction of the bridge with the formal kickoff of the piling works. Officials of Cebu-Cordova Link Expressway Corp. (CCLEC), Metro Pacific Tollways Corp., and Metro Pacific Investment Corp. assured that the bridge will rise by...
By :
Comments : Off