Clients / Flatiron / Dragados
Scope : eviewing, recertifying and completing the design of the New Harbor Bridge
Coordinator : Antonio Martínez Cutillas
Project Manager : Manuel Contreras
Property : Texas Department of Transportation (TxDOT).
Construction : Flatiron / Dragados
End Year Construction : Under Construction
Typology : Cable-stayed bridge
Material : Concrete
GeopositionView ProjectThe project includes the replacement of the existing Harbor Bridge. Include six-lane sections of US 181, three lanes in each direction with a median barrier, shoulders, and a bicycle and pedestrian shared-use path.