Scope : Conceptual, Detailed Design and Technical asistance during Construction
Coordinator : Javier Manterola Armisen
Project Manager : António Martínez Cutillas
End Year Construction : 2001
Typology : Truss and Triangulated Bridges
Team : Javier Manterola Armisén, Antonio Martínez Cutillas, Miguel Ángel Gil Ginés, Amando López Padilla
GeopositionView ProjectThe bridge over the river Ebro is 546 m long and it is made up of a main bridge that is 384 m long and spans measuring 42 m + 60 m +120 m + 2×60 m +42 m. Besides which there is a viaduct access on the right river bank, formed by one 16 m span and 6 x 24 m spans.