This cable-stayed structure is 407.50 m long with a distribution of main spans of 87.50+220.50+87.50 m. The execution of the structure is in its final phase with the installation of the metal railings on the deck, the expansion joint in the accesses and the extension of the asphalt pavement during the next weeks.