Scope : Conceptual and Detailed Design
Coordinator : Leonardo Fernández Troyano
Project Manager : Celso Iglesias Pérez
Construction : UTE FCC y ACS
End Year Construction : 1999
Typology : Girder Bridges
Material : Concrete
Team : Leonardo Fernández Troyano, Celso Iglesias Pérez, José Cuervo Fernández
GeopositionView Project

The A-6 highway access from Galicia to the pass of Piedrafita meant having to built two viaducts of similar characteristics at the Castro-Lamas/Noceda section: both cross a V-shaped valley and they are 403 m and 385 m long, with a maximum pier width of 80 m and 85 m. The total width of the platform is 26.50 meters.