{"id":21825,"date":"2014-01-28T22:41:27","date_gmt":"2014-01-28T22:41:27","guid":{"rendered":"http:\/\/cfcsl.com\/portfolio-items\/high-speed-railway-viaduct-over-the-tera-river-zamora-spain-2014\/"},"modified":"2025-03-06T11:40:30","modified_gmt":"2025-03-06T11:40:30","slug":"high-speed-railway-viaduct-over-the-tera-river-zamora-spain-2014","status":"publish","type":"avada_portfolio","link":"https:\/\/cfcsl.com\/en\/portfolio-items\/high-speed-railway-viaduct-over-the-tera-river-zamora-spain-2014\/","title":{"rendered":"High-speed railway viaduct over the Tera River. Zamora. Spain. 2014."},"content":{"rendered":"<p><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container has-pattern-background has-mask-background nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1216.8px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-title title fusion-title-1 fusion-title-text fusion-title-size-two\" style=\"--awb-text-color:var(--awb-color4);--awb-font-size:70px;\"><div class=\"title-sep-container title-sep-container-left fusion-no-large-visibility fusion-no-medium-visibility fusion-no-small-visibility\"><div class=\"title-sep sep- sep-solid\" style=\"border-color:var(--awb-color7);\"><\/div><\/div><span class=\"awb-title-spacer fusion-no-large-visibility fusion-no-medium-visibility fusion-no-small-visibility\"><\/span><h2 class=\"fusion-title-heading title-heading-left fusion-responsive-typography-calculated\" style=\"font-family:&quot;Spectral&quot;;font-style:normal;font-weight:400;margin:0;letter-spacing:-3px;font-size:1em;--fontSize:70;line-height:var(--awb-typography1-line-height);\">Viaducto de FFCC de alta velocidad sobre el r\u00edo Tera. Zamora. Spain. 2014.<\/h2><span class=\"awb-title-spacer\"><\/span><div class=\"title-sep-container title-sep-container-right\"><div class=\"title-sep sep- sep-solid\" style=\"border-color:var(--awb-color7);\"><\/div><\/div><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_1_4 1_4 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:25%;--awb-margin-top-large:0px;--awb-spacing-right-large:7.68%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:7.68%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\" style=\"--awb-font-size:18px;--awb-line-height:25px;--awb-text-font-family:&quot;IVY STYLE CSS cdnmultimedia&quot;;--awb-text-font-style:normal;--awb-text-font-weight:400;\"><hr>\n<p><strong>CFC Scope<\/strong><br \/>Project<\/p>\n<hr>\n<p><strong>Project Manager<\/strong><br \/>Javier Manterola Armisen<\/p>\n<hr>\n<p><strong>Project Manager<\/strong><br \/>Javier Mu\u00f1oz-Rojas Fern\u00e1ndez<\/p>\n<hr>\n<p><strong>Construction<\/strong><br \/>ACCIONA<\/p>\n<hr>\n<p><strong>Year end of construction<\/strong><br \/>2014<\/p>\n<hr>\n<p><strong>Typology<\/strong><br \/>Arch Bridge<\/p>\n<hr>\n<p><strong>Material<\/strong><br \/>Concrete<\/p>\n<hr>\n<\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"align-self: center;margin-left: auto;margin-right: auto;margin-top:20px;margin-bottom:20px;width:100%;\"><\/div><div ><a class=\"fusion-button button-flat fusion-button-default-size button-custom fusion-button-default button-1 fusion-button-default-span fusion-button-default-type fusion-animated\" style=\"--button_accent_color:#000000;--button_border_color:#000000;--button_accent_hover_color:var(--awb-color5);--button_border_hover_color:var(--awb-color5);--button_border_width-top:1px;--button_border_width-right:1px;--button_border_width-bottom:1px;--button_border_width-left:1px;--button_gradient_top_color:#ffffff;--button_gradient_bottom_color:#ffffff;--button_gradient_top_color_hover:#f4f4f4;--button_gradient_bottom_color_hover:#f4f4f4;width:calc(100%);\" data-animationType=\"bounceInUp\" data-animationDuration=\"1.0\" data-animationOffset=\"bottom-in-view\" target=\"_blank\" rel=\"noopener noreferrer\" href=\"http:\/\/cfcsl.com\/wp-content\/uploads\/2023\/09\/ACHE-2014-VIADUCTO-TERA.pdf\"><span class=\"fusion-button-text awb-button__text awb-button__text--default\">\n<p>WHITEPAPER<\/p>\n<\/span><\/a><\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"align-self: center;margin-left: auto;margin-right: auto;margin-top:20px;margin-bottom:20px;width:100%;\"><\/div><div ><a class=\"fusion-button button-flat fusion-button-default-size button-custom fusion-button-default button-2 fusion-button-default-span fusion-button-default-type fusion-animated\" style=\"--button_accent_color:#000000;--button_border_color:#000000;--button_accent_hover_color:var(--awb-color5);--button_border_hover_color:var(--awb-color5);--button_border_width-top:1px;--button_border_width-right:1px;--button_border_width-bottom:1px;--button_border_width-left:1px;--button_gradient_top_color:#ffffff;--button_gradient_bottom_color:#ffffff;--button_gradient_top_color_hover:#f4f4f4;--button_gradient_bottom_color_hover:#f4f4f4;width:calc(100%);\" data-animationType=\"bounceInUp\" data-animationDuration=\"1.0\" data-animationOffset=\"bottom-in-view\" target=\"_blank\" rel=\"noopener noreferrer\" href=\"http:\/\/cfcsl.com\/wp-content\/uploads\/2023\/09\/858-A1-LAV-RIO-TERA_E.pdf\"><span class=\"fusion-button-text awb-button__text awb-button__text--default\">\n<p>CONCEPTDESIGN<\/p>\n<\/span><\/a><\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"align-self: center;margin-left: auto;margin-right: auto;margin-top:20px;margin-bottom:20px;width:100%;\"><\/div><div ><a class=\"fusion-button button-flat fusion-button-default-size button-custom fusion-button-default button-3 fusion-button-default-span fusion-button-default-type fusion-animated\" style=\"--button_accent_color:#000000;--button_border_color:#000000;--button_accent_hover_color:var(--awb-color5);--button_border_hover_color:var(--awb-color5);--button_border_width-top:1px;--button_border_width-right:1px;--button_border_width-bottom:1px;--button_border_width-left:1px;--button_gradient_top_color:#ffffff;--button_gradient_bottom_color:#ffffff;--button_gradient_top_color_hover:#f4f4f4;--button_gradient_bottom_color_hover:#f4f4f4;width:calc(100%);\" data-animationType=\"bounceInUp\" data-animationDuration=\"1.0\" data-animationOffset=\"bottom-in-view\" target=\"lightbox\" rel=\"iLightbox\" href=\"https:\/\/youtu.be\/GlXTGzEBAdI?si=-FaPbz9Drj5jSE7k\"><i class=\"fa-play-circle fas awb-button__icon awb-button__icon--default button-icon-left\" aria-hidden=\"true\"><\/i><span class=\"fusion-button-text awb-button__text awb-button__text--default\">\n<p>VIDEO<\/p>\n<\/span><\/a><\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"align-self: center;margin-left: auto;margin-right: auto;margin-top:20px;margin-bottom:20px;width:100%;\"><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-2 fusion_builder_column_3_4 3_4 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:75%;--awb-margin-top-large:0px;--awb-spacing-right-large:2.56%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:2.56%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-2\" style=\"--awb-font-size:18px;--awb-line-height:25px;--awb-letter-spacing:1px;--awb-text-font-family:&quot;IVY STYLE CSS cdnmultimedia&quot;;--awb-text-font-style:normal;--awb-text-font-weight:400;\"><p>The Tera Viaduct is situated over the river Tera River between km points 710+697.500 and 711+342.500 of the north-northeast corridor of the Madrid-Galicia high-speed railway line. It is therefore 645 m long with a span distribution of 60-75-150-75\u00d75-60. Such arrangement, with one large 150 m span, is dictated by the crossing of the Tera River, at a point where piers cannot be built within the riverbed due to the presence of a relatively deep lagoon. The solution we gave to the deck in terms of construction and resistance requirements consisted of obtaining a longitudinally continuous platform, modulated in a repetitive manner. This was done with the aim of applying the same type of resistant cross section in the entire structure, namely that of a constant depth box girder, as well as the same construction process, namely the incremental launching, along the entire length regardless of the relative position within the work. In this way, while adopting the typical span modulation of 75 m in the approach spans, we built an arch divided in two halves which spans the 150 m river span supporting the deck at midspan. The deck span is therefore divided into the abovementioned 75 m. We thus solved the construction problem and at the same time obtained an aesthetically attractive outcome. The Tera Viaduct is situated over the river Tera River between km points 710+697.500 and 711+342.500 of the north-northeast corridor of the Madrid-Galicia high-speed railway line. It is therefore 645 m long with a span distribution of 60-75-150-75\u00d75-60. Such arrangement, with one large 150 m span, is dictated by the crossing of the Tera River, at a point where piers cannot be built within the riverbed due to the presence of a relatively deep lagoon. The solution we gave to the deck in terms of construction and resistance requirements consisted of obtaining a longitudinally continuous platform, modulated in a repetitive manner. This was done with the aim of applying the same type of resistant cross section in the entire structure, namely that of a constant depth box girder, as well as the same construction process, namely the incremental launching, along the entire length regardless of the relative position within the work. In this way, while adopting the typical span modulation of 75 m in the approach spans, we built an arch divided in two halves which spans the 150 m river span supporting the deck at midspan. The deck span is therefore divided into the abovementioned 75 m. We thus solved the construction problem and at the same time obtained an aesthetically attractive outcome. The deck dimensions and proportions are those typical for railway bridges built by incremental launching: the 14 m wide platform is placed on a box section, constant depth girder, made of prestressed concrete, with a constant 4.40 m depth and 5.20 m width and inclined, 0.5 m thick webs. There are no tension problems in any of the pier supports. At the abutments, however, the supports are placed slightly wider apart in order to avoid these problems, therefore requiring a transverse beam which is installed in both abutments in a second stage. The deck sits on concrete piers with a hollow rectangular cross section, -except at the head-, whose longitudinal dimension is a constant 3.50 m, while the transverse one is variable, with a 1\/40 slope running from a neck placed below the pier head and whose minimum dimension amounts to 3.20 m. The upper head is bell-shaped, 5.20 m wide, decreasing lineally until reaching the neck area at the height of 7.5 m. The same as in any other incrementally launched bridge, two groups of prestressing cables are arranged. The straight cables provide due compressions for the launching stages, while the undulating cable groups, which are loaded once the launching has concluded, provide the additional capacity to resist the increased service loads. All the supports of the bridge are sphere-shaped, with one free unit and another transversely guided one in each pier at Abutment 1. At Abutment 2 both units are free. The same as in any other incrementally launched bridge, two groups of prestressing cables are arranged. The straight cables provide due compressions for the launching stages, while the undulating cable groups, which are loaded once the launching has concluded, provide the additional capacity to resist the increased service loads. All the supports of the bridge are sphere-shaped, with one free unit and another transversely guided one in each pier at Abutment 1. At Abutment 2 both units are free. The most remarkable part of the viaduct is the 150 m long span supported on an arch which, due to its virtually straight geometry, appears to be composed of two struts. The solutions we weighed up were the concrete and the steel one. The steel solution proved to be more advantageous; we used high-strength steel (S460). In this situation, the strut dead load is of little consequence, and therefore the arch geometry, generated by the loads in the line of trust, results partly from the point load at midspan. The curvature of the semi-arches is therefore very small and its front view resembles two straight struts. The cross section is rectangular with beveled corners in order to create shadows bring out the edges. The typical plate attached to the walls is 15 mm thick with longitudinal T-shaped stiffeners and transverse K-shaped diaphragms placed every 4 m. The constructions process of the bridge deck is carried out by incremental launching from Abutment 2. The segments are 25 m long, since the prefabrication yard had the capacity for 3 segments, which correspond to one complete span. The metal launching nose is 45 m long. The installation of the semi-arches was performed by rotation.<\/p>\n<p>The installation of the semi-arches was performed by rotation. The semi-arches were placed vertically on their springers over provisional hinges. Using provisional stay cables anchored in the contiguous pier foundations, the semi-arches were then rotated until meeting at midspan, where they were duly welded together. Subsequently, the springers were blocked against the foundations by embedding the provisional hinges in the concrete.<\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-2 fusion-flex-container has-pattern-background has-mask-background hundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-background-color:#efefef;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"width:104% !important;max-width:104% !important;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-3 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:-100px;--awb-margin-bottom-large:0px;--awb-spacing-left-large:-100px;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\">\t\t\t\t\t<script type=\"text\/javascript\">\n\t\t\t\t\t\tvar map_fusion_map_69e15feabd9e8;\n\t\t\t\t\t\tvar markers = [];\n\t\t\t\t\t\tvar counter = 0;\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tvar fusionMapNonce = 'fcf14d530e';\n\t\t\t\t\t\t\t\t\t\t\t\tfunction fusion_run_map_fusion_map_69e15feabd9e8() {\n\t\t\t\t\t\t\tjQuery ('#fusion_map_69e15feabd9e8' ).fusion_maps( {\n\t\t\t\t\t\t\t\taddresses: [{\"address\":\"41.983954110504634, -6.226613222237468\",\"infobox_content\":\"\",\"marker\":\"https:\\\/\\\/cfcsl.com\\\/wp-content\\\/plugins\\\/fusion-builder\\\/images\\\/avada_map_marker.png\",\"coordinates\":false,\"cache\":true,\"latitude\":\"41.9838\",\"longitude\":\"-6.231275\"}],\n\t\t\t\t\t\t\t\tanimations: true,\n\t\t\t\t\t\t\t\tinfobox_background_color: 'var(--awb-color5)',\n\t\t\t\t\t\t\t\tinfobox_styling: 'default',\n\t\t\t\t\t\t\t\tinfobox_text_color: 'var(--awb-color5)',\n\t\t\t\t\t\t\t\tmap_style: 'custom',\n\t\t\t\t\t\t\t\tmap_type: 'hybrid',\n\t\t\t\t\t\t\t\tmarker_icon: 'theme',\n\t\t\t\t\t\t\t\toverlay_color: '#2cabdd',\n\t\t\t\t\t\t\t\toverlay_color_hsl: {\"hue\":197,\"sat\":72,\"lum\":52},\n\t\t\t\t\t\t\t\tshow_address: false,\n\t\t\t\t\t\t\t\tscale_control: true,\n\t\t\t\t\t\t\t\tscrollwheel: true,\n\t\t\t\t\t\t\t\tzoom: 16,\n\t\t\t\t\t\t\t\tzoom_control: true,\n\t\t\t\t\t\t\t} );\n\t\t\t\t\t\t}\n\n\t\t\t\t\t\tgoogle.maps.event.addDomListener(window, 'load', fusion_run_map_fusion_map_69e15feabd9e8);\n\t\t\t\t\t<\/script>\n\t\t\t\t\t<div class=\"shortcode-map fusion-google-map fusion-maps-js-type\" style=\"--awb-height:500px;\" id=\"fusion_map_69e15feabd9e8\"><\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":20568,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"portfolio_category":[321,316,314,315,399],"portfolio_skills":[],"portfolio_tags":[467,391,465,469,451],"class_list":["post-21825","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-arch-bridges","portfolio_category-puentes-en","portfolio_category-destacados-home-en","portfolio_category-proyectos-en","portfolio_category-spain","portfolio_tags-arch-bridges","portfolio_tags-bridges","portfolio_tags-main-projects","portfolio_tags-projects","portfolio_tags-spain"],"_links":{"self":[{"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/avada_portfolio\/21825","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/avada_portfolio"}],"about":[{"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/types\/avada_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/comments?post=21825"}],"version-history":[{"count":8,"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/avada_portfolio\/21825\/revisions"}],"predecessor-version":[{"id":21833,"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/avada_portfolio\/21825\/revisions\/21833"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/media\/20568"}],"wp:attachment":[{"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/media?parent=21825"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/portfolio_category?post=21825"},{"taxonomy":"portfolio_skills","embeddable":true,"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/portfolio_skills?post=21825"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/cfcsl.com\/en\/wp-json\/wp\/v2\/portfolio_tags?post=21825"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}