Company

TECHNICAL TEAM, R&D, TECHNOLOGY, EQUIPMENT

Contactar

Civil engineering · Structures

Leading Engineering Company

An independent civil engineering project company based in Madrid, Spain, specializing in the development and supervision of structural projects worldwide.

The company has designed, built and supervised a large number of special structures worldwide, particularly bridges, some of which hold various world records .

Specialized in Highly Complex Structures

Highly specialized team

CFCSL has a large team of highly specialized engineers trained in the study of complex structural problems.

Several of its members are professors at the Polytechnic University of Madrid and members of national and international technical committees .

Contactar

Contactar

Special structures

That provides specialized services

They cover all project phases:
· Feasibility studies
· Preliminary designs
· Construction projects
· Construction supervision

. They also act as independent project supervisors 

Our Team

Passionate about what we do

Civil Engineer, Canals and Ports, from the Higher Technical School of Civil Engineers, Canals and Ports of Madrid (1987).

Specialty: Foundations and Structures

Doctor of Engineering in 1993.

Don Antonio Martínez Cutillas

Board Director of CFC

Antonio Martínez has worked for Carlos Fernández Casado, SL since 1987 in bridge design and analysis. He has conducted research on the dynamic behavior of bridge piers. He has extensive experience in the design of prestressed concrete bridges and composite steel-concrete bridges. He has participated in more than 50 projects, most of which have been built, including:

2024. Construction engineering for the expansion of the V Centenario Bridge (Seville). Cable-stayed bridge with 2 towers. Main span 265 m.

Fourth bridge over the Panama Canal. Review for the end customer by a committee of cable-stayed bridge experts.

2023. Harbor Bridge Project and Construction (USA). Cable-stayed bridge. Main span 506 m.

2023. Gordie Howe International Bridge Project and Construction (Canada-USA). Cable-stayed bridge. Main span 850 m.

2019. Bridge over the Strait of Tiquina (Bolivia). Cable-stayed bridge. Main span 750 m.

2019 – Tender for the cable-stayed bridge of the main span over the “Bay of All Saints” connecting Salvador de Bahia with the island of Itaparica (Brazil). Cable-suspended bridge. Length 1000 m. Main span 550 m. 2 side spans of 225 m each. Width 36 meters, a height above sea level of 125 m and 2 towers of 276 m each. Located in the deepest part of the bay with water depths of 60 m.

2015. Cable-stayed bridge over the Bay of Cádiz (Spain). Main span 540 m.

2013. Bridge over the Arno River (Italy). Arch bridge. Main span 110 m.

2013. Bridge over the Magdalena River. (Colombia). Cable-stayed bridge. Maximum span 380 m.

2013. Cable-stayed bridge over the Danube River between Bulgaria and Romania. Main span 180 m.

2011. Basarab Drawbridge in Bucharest (Romania). Main light 171 m.

2008. Arch bridge over the Contreras reservoir on the Madrid-Levante high-speed line. Minglanilla-Villagordo del Cabriel section (Spain). Arch bridge. High-speed railway. Length: 587 m. Span: 261 m.

 

Civil Engineer, Canals and Ports, from the Higher Technical School of Civil Engineers, Canals and Ports of Madrid (1990).

Specialty: Foundations and Structures

MSOAENPC Paris. France. 1991 (Specialized Master’s in Engineering Structures. National School of Bridges and Roads.

Don Javier Muñoz-Rojas Fernández

Board Director of CFC

35 years of experience in Planning, Design, Design Review, Construction Engineering and Supervision of Bridges and Special Structures, including:

Current Events. New Central Highway. Peru. Conceptual and detailed design of more than 100 bridges for the New Central Highway of Peru.

Current events. Detailed design of the General Carrera cable-stayed bridge. Chile. Main span: 200m.

Current events. Detailed design of the Raúl Marín Balmaceda cable-stayed bridge. Chile. Main span: 200m.

2020. Detailed design of the arch bridges of the Chamorro and Salitral network.

2020. Rehabilitation and seismic retrofitting of the Herradura Viaduct on the Central Highway. Colombia.

2020. Detailed design of the Puerto Berrío Bridge over the Magdalena River. Colombia.

2019. “East Bridge” over the Jiangxi River. High-tech zone. Self-anchored steel arch bridge. Chengdu, China. Main span 160 m.

2017. Detailed design of the cable-stayed bridge of the Cebu–Cordova Expressway. Cebu, Philippines. Main span: 390 m

2017. Detailed design of five steel arch bridges in Cusco, Peru.

2015. Detailed design of the concrete arch bridge over the Vilcanota River. Maranura, Peru.

2014. Detailed design of the cable-stayed bridge over the Magdalena River. Barranquilla, Colombia.

2014. Detailed design of the railway viaduct over the Tera River. Zamora, Spain.

2013. Access viaducts to the new Pumarejo Bridge. Barranquilla, Colombia.

2012. Detailed design of the Karabel steel arch bridge over the Urumea River. Hernani, Spain.

2010. Detailed design of the bascule bridge over the Cau Cau River. Valdivia, Chile.

2010. Detailed design of the HSR railway station in Medina del Campo, Spain.

BOARD OF DIRECTORS
ANTONIO MARTÍNEZ CUTILLAS

Chief Executive Officer

JAVIER MUÑOZ-ROJAS FERNÁNDEZ

Chief Executive Officer

EXPERT ENGINEER
MIGUEL ÁNGEL ASTIZ SUÁREZ

Expert Engineer

MIGUEL ÁNGEL GIL GINÉS

Expert Engineer

MANAGEMENT & LEAD DESIGN
LUCÍA FERNÁNDEZ MUÑOZ

Director of Quality, Environmental Management and Internal Policy

JUAN ANTONIO NAVARRO GONZÁLEZ-VALERIO

Head of Operations

BORJA MANTÍN MARTÍNEZ

Head of Strategy and Business Development

SILVIA FUENTE GARCÍA

Head of Production, Planning and Resources

GUILLERMO AYUSO CALLE

Head of Information Technology

JOSÉ MANUEL DOMÍNGUEZ CABELLO

Head of Methodology and Project Development

PROJECT ENGINEER LEAD
RAÚL GONZÁLEZ AGUILAR

Project Engineer Lead

ANTONIO CANO FERNÁNDEZ-CARRIÓN

Project Engineer Lead

ALBERTO MUÑOZ TARILONTE

Project Engineer Lead

MANUEL VALERO BARAT

Project Engineer Lead

SENIOR ENGINEER
SANTIAGO RODRIGUEZ LORENTE

Senior Engineer

ALBERTO PÉREZ

Senior Engineer

PEDRAM MANOUCHEHRI

Senior Engineer

GONZALO MARINAS SANZ

Senior Engineer

PROJECT ENGINEER
LUISANGEL ALEGRE TORRES

Project Engineer

ANTONIO BARCELÓ

Project Engineer

ALBERTO RODRÍGUEZ RUIZ

Project Engineer

NAM NGUYEN

Project Engineer

CRISTIAN LANDOÑO

Project Engineer

JUNIOR ENGINEER
ALBERTO SANCHEZ CABALLERO

Junior Engineer

IVÁN ARLANZÓN

Junior Engineer

MARTÍN ORTIZ

Junior Engineer

DANIEL LÓPEZ

Junior Engineer

PEDRO HERRERA

Junior Engineer

BIM / CAD AREA
CARLOS HERRERO SÁNCHEZ

Head of BIM and CAD área

BIM AREA
IGNACIO DE LA ARADA ESCUDERO

BIM Coordinator

LUIS JAVIER BASCO HIJÓN

BIM drafting technician

LUIS ALBERTO GÓMERA MORERA

BIM drafting technician

MIGUEL ÁNGEL MURILLO GARCÍA

BIM drafting technician

DIEGO PAREDES

BIM drafting technician

DOMINIKE RICAPA

BIM drafting technician

CAMILA ÁVALOS

BIM drafting technician

LORENA CLAVIJO

BIM drafting technician

VALERIA MOLINA

BIM drafting technician

ANA NAVARRO TORRES

BIM drafting technician

CAD AREA
Emilio Sánchez Martín

CAD Designer

MARIZE BENAYAS PAZOS

CAD Designer

ELVIRA QUINTANA GONZÁLEZ

CAD Designer

ROBERTO CARMONA GARCÍA

CAD Designer

ADMINISTRATION
LEONARDO FERNÁNDEZ MUÑOZ

Financial Director

CARLOS MANTEROLA JARA

Project Controller / Communication