Huixquilucan I bridge. Mexico DF México. 1994.


CFC Scope

Project


Project Manager

Leonardo Fernández Casado


Project Manager

Leonardo Fernández Casado


Construction end date

1992


Property

COTREM, Estado de México


Construction

GMD, Grupo Mexicano de Desarrollo S.A. de C.V. (OPSA Obras y Proyectos S.A. de C.V.)


Typology

Beam Bridges


Material

Concrete

This viaduct is located in Mexico City, with a length of 165 metres, and 4 spans of 30+2x50x32 metres. The piers have a maximum height of 53 metres. The deck is 16 metres wide, and consists of a single-cell trapezoidal box 8 metres wide at the base, with an edge of 3.60 metres. The fundamental problem posed by the construction of this viaduct was the speed with which it had to be built. For this reason, in this case, the segments of the park were made in full section in a single phase. The viaduct was completed in 1994.