Acebosa Viaduct. Santander. Spain. 2001.
CFC Scope
Project and Technical Assistance to Construction Company
Project Director
Javier Manterola Armisén
Jefe de proyecto
Antonio Martínez Cutillas
Customer
UTE-FCC-Dragados
Property
Ministry of Public Works
Construction
UTE-FCC-Dragados
Fecha fin construcción
2001
Typology
Bridges Beam
Material
Precast concrete
The Acebosa Bridge is the first fully prefabricated bridge with a curved cross-section.
It is subdivided into a central prefabricated curved bottom beam and prefabricated ribs.
It is a 417.20 m long continuous bridge with 45 m spans. of light.


