Acebosa Viaduct. Santander. Spain. 2001.


CFC Scope
Project and Technical Assistance to Construction Company


Project Director
Javier Manterola Armisén


Jefe de proyecto
Antonio Martínez Cutillas


Customer
UTE-FCC-Dragados


Property
Ministry of Public Works


Construction
UTE-FCC-Dragados


Fecha fin construcción
2001


Typology
Bridges Beam


Material
Precast concrete

The Acebosa Bridge is the first fully prefabricated bridge with a curved cross-section.

It is subdivided into a central prefabricated curved bottom beam and prefabricated ribs.

It is a 417.20 m long continuous bridge with 45 m spans. of light.