Cadagua Junction Vizcaya. Spain. 2011.


CFC Scope
Project


Project Manager
Javier Manterola Armisén


Project Manager
Miguel Ángel Gil


Construction
UTE Gorostiza (Sacyr, Exbasa)


Construction end date
2011


Typology
Metal and composite bridges

This is a complex link-up carried out over the Cadagua River of two motorways and two railway tracks running on a steep slope. The junction is comprised of three large bridges, two of which are split in two to accommodate the intersections, whereas a third bridge has a large curvature and a great width. The split viaducts are 18.0 and 21.0 m wide respectively, with the branches of the split stretch being 13.8 m wide. The length of the two ranges approximately from 637.42 m. to 678.7 m. The end spans of the viaducts and branches are 80 m long, while the length of the typical intermediate spans is approximately 100 m, ranging from 100 m to 116 m to 102.84 m to 104.2 m.