About cdnadmincfcsl

This author has not yet filled in any details.
So far cdnadmincfcsl has created 35 blog entries.

CFC joins ARX group: together, we build the future

CFC joins ARX group: together, we build the future We are thrilled to announce that Carlos Fernández Casado S.L. is now part of the ARX group, a global engineering group renowned for its innovation and technical excellence. This strategic step will allow us to maintain our essence and independence to continue offering a

CFC joins ARX group: together, we build the future2025-03-28T08:17:31+00:00

The towers of the Gordie Howe Bridge reach their final height. USA / Canada

The towers of the Gordie Howe Bridge reach their final height. USA / Canada. The countdown for both towers of the Gordon Howe International Bridge project to reach their final height has begun. While the US side tower has already reached its final height of 220m (772ft) with the

The towers of the Gordie Howe Bridge reach their final height. USA / Canada2026-04-06T15:34:11+00:00

Construction progress of the bridge over the Huallaga river in Santa Lucía. Department of San Martin. Perú.

A Construction progress of the bridge over the Huallaga river in Santa Lucía. Department of San Martin. Perú. This cable-stayed structure is 407.50 m long with a distribution of main spans of 87.50+220.50+87.50 m. The execution of the structure is in its final phase with the installation of the

Construction progress of the bridge over the Huallaga river in Santa Lucía. Department of San Martin. Perú.2025-03-28T07:54:21+00:00

Two CFC projects have been shortlisted in three categories of the IABSE 2023 awards.

Two CFC projects have been shortlisted in three categories of the IABSE 2023 awards. IABSE - International Association for Bridge and Structural Engineering has announced the list of nominated projects for the "Project and Technology Awards 2023". https://lnkd.in/dcjy8wTJ We are delighted to announce that two CFC projects have been

Two CFC projects have been shortlisted in three categories of the IABSE 2023 awards.2025-03-17T15:50:02+00:00

We begin with the board above the arch on the bridge over the river Tagus. Reservoir of Alcántara. Cáceres.

We begin with the board on arch on the bridge over the river Tajo Once the arch has been closed, the tasks of dismantling and removing the temporary braces have been carried out, and the temporary braces have been dismantled. temporary braces removed the metal pylons demolished over the River

We begin with the board above the arch on the bridge over the river Tagus. Reservoir of Alcántara. Cáceres.2026-02-10T08:37:05+00:00

Last weekend the load test of the Viaduct over the Tagus River was carried out.

Last weekend the load test of the Viaduct over the Tagus River was carried out. The load test of a structure is a process that, by reproducing a load state on it, aims to obtain sufficient data on its response to that state, so that its functional behavior can

Last weekend the load test of the Viaduct over the Tagus River was carried out.2026-04-06T15:23:54+00:00

RECENT PROJECTS